New basement bathrooms
From bare floor to a full bathroom
If your basement has a rough-in, the drains are already in place. If not, we can cut the slab to tie into the main drain or install a pump system where gravity drains are not possible.
Our in-house BCIN designer prepares drawings when a permit is needed, and we handle the plumbing permit.
- Rough-in checkLocate and test existing drains
- Slab cuttingFor new drain lines
- Pump systemsWhen drains cannot run by gravity
- VentingPlumbing vents and exhaust fan
- Full finishingShower, vanity, toilet, tile
- PermitPlumbing permit handled
How it works
From first call to finished work
Quick site visit
We look at the space, measure and talk through options.
Written estimate
A clear, line-by-line quote and timeline.
Build
Our crew does the work in the right order, permits included where needed.
Walkthrough
We check everything with you before we call it done.
FAQ
Common questions
How do I know if I have a rough-in?
Look for capped pipes in the floor, usually near the main stack. We confirm on the visit.

