Free on-site assessment · Mon–Sat 8:00–5:30 · (705) 970-5677

Home / Bathroom / Shower Glass

Shower glass installation, measured to fit

Frameless, semi-frameless and black-framed glass enclosures, sliding doors and fixed panels, measured on site and installed to seal properly.

Empire Design & Construction job photo: Sliding glass shower door

Glass showers

Clean lines and no leaks

Glass is measured after tile is finished, so the panels fit your actual walls. We set hardware into solid backing and seal the base so water stays inside.

Choose clear or frosted glass and chrome, matte black or brushed hardware to match your fixtures.

  • Frameless doorsHeavy glass with minimal hardware
  • Black-framed glassModern framed look
  • Sliding doorsFor tighter bathrooms
  • Fixed panelsWalk-in showers without a door
  • Tub screensGlass instead of a curtain
  • ReplacementNew glass on existing showers

How it works

From first call to finished work

Quick site visit

We look at the space, measure and talk through options.

Written estimate

A clear, line-by-line quote and timeline.

Build

Our crew does the work in the right order, permits included where needed.

Walkthrough

We check everything with you before we call it done.

FAQ

Common questions

How long does glass take?

Glass is cut to measure after tiling, which usually adds a short wait. We schedule it into your project timeline.

Can you replace glass on my existing shower?

Yes, as long as the curb and walls are in good condition.

Get a free on-site estimate

Tell us about your project and we'll book a visit at a time that suits you.